Main and Superstructure Decks Reinstatement with SPS Overlay
• Work executed offshore In-situ Ivory Coast
• Low Heat Input Solution, 515m² in 55 days.
• Utilised SPS Overlay so that no cutting through the deck plate is required, therefore minimising operations disruption.
• Minimise disturbance to L.Q.
• Injection scope of work carried out by ASOM trained injection engineer